Summary

AI researcher, software developer, and systems designer working at the intersection of generative AI, machine learning, and human-computer interaction. PhD holder at METU with 7 international and 4 national publications on AI-integrated design systems, paired with hands-on industry experience training and evaluating frontier AI models as a data scientist and domain expert. (Ex) co-founder of two technology ventures and technical lead behind various projects, bringing a rare blend of academic knowledge and practical experience.

Research Interests
computational design, generative systems, data visualization, machine learning, artificial intelligence, design/objective space exploration, geometry processing, multi-objective optimization, deterministic/probabilistic/hybrid approaches
Education
Doctor of Philosophy, Building Science 2020 – 2026
Middle East Technical University (METU), Graduate School of Natural and Applied Sciences Thesis: [code]sign: A Collaborative Framework Integrating Human and Artificial Intelligence in Design
Master of Science, Building Science 2017 – 2020
Middle East Technical University (METU), Graduate School of Natural and Applied Sciences Thesis: Design-Objective Space Exploration and Multi-Objective Optimization of Initial Design Alternatives via Machine Learning
Bachelor of Architecture 2013 – 2017
Middle East Technical University (METU), Department of Architecture Graduated as an Honor Student, ranking 3rd out of 131 students
Work Experience
Senior AI Engineer Sep 2026 – Present
Synaps, Vienna Developing AI-powered architectural design tools, including drawing generation, sketch tracing, and spatial visualization workflows. Contributing to connected CAD and BIM workflows that enable precise drafting, real-time collaboration, and client-ready documentation.
Research Assistant Apr 2019 – Present
Middle East Technical University (METU), Ankara Conducted advanced research in computational design and AI applications in architecture, specifically developing a PhD thesis focusing on human-AI collaboration. Published 7 international and 4 national conference papers on computational design and AI integration, with an h-index of 4. Assisted in 10+ advanced courses and contributed to TUBITAK-funded research projects with a total funding of 150,000 USD.
AI Domain Expert, Human Data Reviewer Apr 2026 – Sep 2026
micro1, Palo Alto (Remote) Prepared and reviewed over 250 complex tasks alongside specific evaluation rubrics for artificial intelligence training. Evaluated and designed benchmarks for complex CAD workflows to enhance world-leading AI models, achieving improvements in geometric consistency.
Data Scientist, Team Lead Jul 2024 – Mar 2026
Turing, Palo Alto (Remote) Led a team of 6-10 domain experts to improve world-leading AI models, reporting key performance metrics such as throughput, quality, and compliance. Executed 6 distinct AI projects encompassing code evaluations, problem creation, conversation ratings, and chain-of-thought evaluations, leading to the improvement of models.
Technical Lead Jun 2022 – Oct 2024
Develad Media Technologies, Istanbul Led end-to-end development of an innovative AR/XR sports platform, reaching over 10,000 users. Secured promotional partnerships with major entities including Göztepe, Galatasaray, and the Turkish National Football Team. Delivered real-time mixed reality experiences to large stadium audiences.
Co-Founder Oct 2022 – Jan 2024
Megscope Medical Technologies, Izmir Co-founded a medtech startup focused on AI-assisted diagnostic and imaging software. Managed product direction and technical strategy, securing a $100,000 USD seed investment offer.
Co-Founder Jul 2019 – Sep 2023
OPTIO Design Technologies, Ankara Co-founded a design technology startup for automated generation and comparison of architectural design alternatives. Secured $25,000 USD via TUBITAK-BiGG and a subsequent $75,000 USD grant through TUBITAK-1507. Engineered an automated workflow generating detailed 3D building designs within 5 minutes.
R&D Specialist Jun 2018 – Feb 2019
BY Teknik, Ankara Developed innovative solutions in building design and engineering systems. Spearheaded 5 design projects, reducing modeling times from days to hours.
Freelance Designer Aug 2017 – Jun 2018
UpWork, Remote Delivered parametric modeling, computational design, and data visualization projects for international clients across architecture and engineering domains.
Research Experience
Water Efficiency in Urban Green Areas with Image Processing Nov 2024 – Sep 2025
Project Developer, 1812–TUBITAK–BiGG Investment
Automation/Optimization/Suggestion System for Sustainable Housing Design Jan 2022 – Jul 2023
Project Developer, 1507–TUBITAK–BILTEG
AI Supported Generative System for Performative Acoustic Panels Jan 2021 – Jan 2022
Project Researcher, 1001–TUBITAK–BAP
Autonomous Building Design System Sep 2020 – Sep 2021
Project Developer, 1512–TUBITAK–BiGG
AFL Computer Olympics Oct 2010 – Jun 2012
Participant, TUBITAK
BILSEM Research Project in Physics Jan 2010 – Sep 2010
Student Researcher, 2204–TUBITAK
Publications

International Conference and Symposium Presentations

The Designer in the Loop: Navigating Informed Creativity through Human-AI Collaboration 2026
Yetkin, O. Informed Creativity and Fabrication in Architecture and Engineering, Proceedings of the 44th Annual Conference of the Association of Education and Research in Computer Aided Architectural Design in Europe (eCAADe 2026), Lübeck, Germany.
AI-Integrated Pattern Prediction Model: Exploring the Influence of Building Fabric Morphology on Land Use Pattern 2025
Karadogan, S., Yetkin, O., Efeoglu, E., Coban, A. B. Urban Morphology in the Age of Artificial Intelligence, Proceedings of the XXXII Conference International Seminar on Urban Form (ISUF 2025), Torino, Italy.
Liminality: Augmented Reality Experiences at the Boundary of the Physical and the Digital 2025
Gonenc Sorguc, A., Krusa Yemiscioglu, M., Yetkin, O. Confluence, Proceedings of the 43rd Annual Conference of the Association of Education and Research in Computer Aided Architectural Design in Europe (eCAADe 2025), Ankara, Turkey.
Collaborating with Agents in Architectural Design and Decision-Making Process: Top-Down and Bottom-Up Case Studies Using Reinforcement Learning 2023
Yetkin, O., Surer, E., Gonenc Sorguc, A. European Alliance for Innovation, Proceedings of the Smart Objects and Technologies for Social Good (EAI GOODTECHS 2023), Leiria, Portugal.
Levels of Mapping in Nature-informed Studies: A Case Study on Informed Wall 2022
Krusa Yemiscioglu, M., Gonenc Sorguc, A., Yetkin, O. Co-creating the Future: Inclusion in and through Design, Proceedings of the 40th Annual Conference of the Association of Education and Research in Computer Aided Architectural Design in Europe (eCAADe 2022), Ghent, Belgium.
Design Space Exploration of Initial Structural Design Alternatives via Artificial Neural Networks 2019
Yetkin, O., Gonenc Sorguc, A. Architecture in the Age of the 4th Industrial Revolution, Proceedings of the 37th Annual Conference of the Association of Education and Research in Computer Aided Architectural Design in Europe (eCAADe 2019), Porto, Portugal.
A Novel Approach for Classification of Structural Elements in a 3D Model by Supervised Learning 2018
Yetis, G., Yetkin, O., Moon, K.P., Kilic, O. Computing for a Better Tomorrow, Proceedings of the 36th Annual Conference of the Association of Education and Research in Computer Aided Architectural Design in Europe (eCAADe 2018), Lodz, Poland.

National Conference and Symposium Presentations

Demystifying Machine Learning for Architecture Students 2022
Gonenc Sorguc, A., Krusa Yemiscioglu, Yetkin, O. XVI. Mimarlikta Sayisal Tasarim Sempozyumu (MSTAS 2022), Eskisehir.
Sayisal Tasarim Araclarinin Kisi mi Geliyor? 2020
Gonenc Sorguc, A., Yetkin, O., Krusa Yemiscioglu, M., Özgenel, Ç.F. XIV. Mimarlikta Sayisal Tasarim Sempozyumu (MSTAS 2020), Trabzon.
Zitliklardan Ara Mekanlara 2017
Yetkin, O. XI. Mimarlikta Sayisal Tasarim Sempozyumu (MSTAS 2017), Poster Presentation, Ankara.
Conflict of the Virtual/Real Space, Morphology of the Snowflake 2017
Sahinler, K., Yetis, G., Yetkin, O. XI. Mimarlikta Sayisal Tasarim Sempozyumu (MSTAS 2017), Poster Presentation, Ankara.
Organized Events
44th Annual Conference of the Association of Education and Research in Computer Aided Architectural Design in Europe, eCAADe2026 Sep 2026
Scientific Committee Member
Association of European Schools of Planning, AESOP Dec 2025
Artificial Intelligence Thematic Group Member
43rd Annual Conference of the Association of Education and Research in Computer Aided Architectural Design in Europe, eCAADe2025 Sep 2025
Scientific Committee Member
Design x Language: Exploring AI-Augmented Design Workflows, eCAADe2025 Workshops Sep 2025
Instructor
Performative Design Strategies for Extreme Conditions on Mars, DigitalFUTURES Jun 2022
Instructor
International Council for Research and Innovation in Building and Construction Oct 2022
Coordinator
Concrete Structure Design Competition, Cement Industry Employers' Association Feb 2020
Prize Winner
Speculations on the New: Text Competition, Architects' Association 1927 Feb 2020
Prize Winner
Architectural Design Studio-IV Final Jury, TOBB University of Economics and Technology Aug 2019
Jury Member
Breaking the Walls of Sleepless Nights, DAAD Falling Walls Lab 2018 May 2018
Presenter
Home Planet's Mars Urbanization Challenge, Launch Forth Education League Aug 2017
Participant
Inside Out: Virtual Reality, Projection Mapping, and Pavilion Exhibition, METU Faculty of Architecture Jul 2017
Contributor
Flying in/on/over Boundless Boundaries: Virtual Reality Exhibition, METU Faculty of Architecture Mar 2017
Contributor
Are We Human?, 3rd Istanbul Design Biennial Oct 2016
Contributor
Assisted Courses
BS 723 - Introduction to Machine Learning in Architecture 2020 – Present
Middle East Technical University (METU), Department of Architecture
BS 724 - Nature Informed Computational Design in Architecture 2020 – Present
Middle East Technical University (METU), Department of Architecture
BS 725 - Folding in Architecture 2021 – Present
Middle East Technical University (METU), Department of Architecture
BS 770 - Digital Fabrication Techniques in Architecture 2019 – Present
Middle East Technical University (METU), Department of Architecture
ARCH 470 - Digital Design Studio 2019 – Present
Middle East Technical University (METU), Department of Architecture
ARCH 469 - Deep-Tech Driven Design 2026 – Present
Middle East Technical University (METU), Department of Architecture
ARCH 475 - Advanced Digital Design Studio 2019 – Present
Middle East Technical University (METU), Department of Architecture
ARCH 333 - Mathematics in Architecture 2019 – Present
Middle East Technical University (METU), Department of Architecture
ARCH 351 - Building Detail Modeling 2023 – 2025
Middle East Technical University (METU), Department of Architecture
ARCH 204 - Digital Media in Architecture II 2019 – 2025
Middle East Technical University (METU), Department of Architecture
ARCH 203 - Digital Media in Architecture I 2019 – 2021
Middle East Technical University (METU), Department of Architecture
ARCH 231 - Architectural Engineering: Statics and Strength of Materials 2022 – 2023
Middle East Technical University (METU), Department of Architecture
ARCH 251 - Building Materials Technologies 2019 – 2021
Middle East Technical University (METU), Department of Architecture
Workshops & Certificates
Data Science Certificate 2022
HackerRank
Deep Learning in Computer Vision Seminar 2018
METU Multimedia Informatics
Interdisciplinary Design Studio 2017
METU Design Factory
Autodesk Fusion 360 Workshop 2017
METU Design Factory
Machine Learning Course 2017
Udemy
Python Programming Course 2017
Codecademy
Languages
Turkish : Native
English : Fluent
German : Beginner
Computer Literacy & Tools

Programming Languages

Python : Advanced
JavaScript : Advanced
HTML/CSS : Advanced
C# : Advanced
C++ : Advanced
C : Advanced
R : Intermediate
Dart : Intermediate
Rust : Intermediate
Go : Intermediate
Lua : Intermediate
Java : Intermediate
GitHub contribution graph

Tools

Rhinoceros : Advanced
Grasshopper : Advanced
Blender : Advanced
OpenSCAD : Advanced
Revit : Advanced
Dynamo : Advanced
Processing : Advanced
Fusion 360 : Intermediate
Unity : Intermediate
Unreal : Intermediate
Illustrator : Intermediate
Photoshop : Intermediate
Mini Portfolio
Collaborate

Given that you've demonstrated remarkable persistence by navigating through this rabbit hole, I suspect you may have a genuine interest in collaboration. Please proceed accordingly: